53 Years of Excellence  
  . News Letter Feb 2013                BRO Day Message                 
HQ DGBR
Hindi Version



Bridging And Tunnels

Shri Vinod Kumar, CE

DDG(Br&Tnls)

 

 

 

 

 

 


ESTABLISHMENT

            During 1965 a separate bridge cell was formed under Director, Tech Planning in HQ DGBR for construction of major pmt bridges.  The cell was headed by a SO-I and consisted of three SO-2 and One SO-3.  When the pmt bridge activities started gaining momentum, a full fledged Bridge Directorate headed By Deputy Director General (Bridges) of the rank of Chief Engineer was sanctioned in 1983. In Dec 2002, a Tunneling Cell also opened and the Dte was renamed as Bridging & Tunneling Dte.    

CHARTER OF DUTIES

            This Dte deals with all aspects of Major Permanent Bridges as well as responsible for tunnel activities.   

DEPARTMENTAL CONSTRUCTION

            In order to increase the potential of department, specially in remote areas, two Bridge Construction Companies (BCCs) (1441 & 1442) were raised during 1986 for execution of pmt bridges.  These were deployed under project Vartak and Deepak respectively. Subsequently during 1993-94, two more Bridge Construction Companies (BCCs) (1443 & 1444) were raised and deployed under project Udayak. This was done for enhancing the departmental bridge construction capability of BRO.

ACHIEVEMENT

            A total number of 458 Major Permanent bridges covering a water gap of about 42,079 RM lengths have been completed up to 31 Mar 2012. 

            Out of 458 Nos of bridges completed, 241 Nos have been constructed departmentally and 217 through execution contract.

NEW RAISING : BCCs

To further built up capacity of departmental construction of bridges, Govt sanction was obtained for raising four BCCs in Oct 2007. The Deployment of BCCs are as under

           

1445 BCC (P) Sampark

1446 BCC (P) Udayak

1447 BCC (P) STF Hirak

1448 BCC (P) Arunank

       Bridge Supervision Cell (BSC)

            There are eight Bridge Supervision Cells in the various Projects to supervise construction of maj pmt bridges through contract.

            1501 BSC (P) Udayak

            1502 BSC (P) Udayak

            1503 BSC (P) Sampark

            1504 BSC (P) Beacon

            1505 BSC (P) Beacon

            1506 BSC (P) Sampark

            1507 BSC (P) Sewak

            1508 BSC (P) Swastik

            Sub Soil Investigation Section (SIS)

            For carrying out Sub Soil Investigations departmentally, eight (SIS sections) are deployed as under:-

             1451 SIS (P) Beacon

            1452 SIS (P) Udayak

            1453 SIS (P) Shivalik

            1454 SIS (P) Vartak

            1455 SIS (P) Udayak

            1456 SIS (P) STF Hirak

            1457 SIS (P) Sampark

            1458 SIS (P) Vartak

Sub Links

Establishment

Achievement

Activities

Contact

Tunnels

Br News Letters