- Lay down the repair policy in the BRO.
- Ensure maximum equipment availability by monitoring CSP (EOA) state by expediting repairs at Fd Workshops /overhaul of eng and other major assets at Base Workshops and prioritizing eng release.
- Planning, issue and progress of annual/special overhaul program of both GREF Base Workshops
- Preparation of 5 year Roll On Plan on yearly basis for base overhaulof vehicles/equipments/plants/engines.
- Ensure effective implementation of ROP for the current production year by scheduling of overhaul and timely evacuation of repairables.
- Monitor the output of both the Base Workshops on monthly basis and ensure maximum capacity utilization.
- Central control of all GREF workshops, plants and machinery.
- Planning and execution of Annual Technical Inspection of Base Workshops and Fd Workshops.
- Monitor the expenditure on repair through trade by the Fd Workshops.
- Monitor repairs of new buy vehicle/equipment under warranty by the firms.
|