| Tender Heading |
Last Date |
Details |
| SS OF VARIOUS MATERIALS REQUIRED FOR BUSG AND 20 MM THICK PREMIX CARPET WITH SSC FOR RESURF WKS BETWEEN KM 94.650 TO 98.458 KM 103.960 TO KM 109.590 AND KM 112.500 TO 132.000 ON SC RD UNDER 74 RCC 24 TF PROJECT PUSHPAK |
07/08/2013 |
See... |
| SS OF VARIOUS MATERIALS REQUIRED FOR CONSTRUCTION OF APPROACH SLAB AND SURF WK FOR 5 NOS PMT BR KM 191.75 KM 190.88 KM 190.55 KM 188.72 AND AT KM 146.70 ON BJ RD OF NH 53 UDR 115 RCC 765 TF PROJECT PUSHPAK |
06/08/2013 |
See... |
| PL of BM 50 MM and BC 40 MM for resurf and correction work for 2013 14 between Km 196.00 to 221.138 on JB road under 765 BRTF under Pushpak |
03/08/2013 |
See... |
| Supply of various materials reqd for resurf and correction work between Km 32.285 to Km 42.000 and Km 108.664 to Km 119.917 on ST rd in 765 BRTF Pushpak |
01/08/2013 |
See... |
| DETAILS OF TENDERING ACTION AND CONTRACT CONCLUDED MAY 2013 : PROJECT PUSHPAK |
08/06/2013 |
See... |
| PROVIDING AND LAYING OF BM 50 MM AND BC 40 MM WITH COMPACTION AND APPLYING TACK COAT PRIMER COAT FOR RESURF BETWEEN KM 3.200 TO KM 8.555 AND KM 11.090 TO KM 11.210 ON S B RD FOR RESURF WORKS UDR 765 TF PROJECT PSK IN ASSAM STATE |
16/05/2013 |
See... |
| SS OF VARIOUS MATERIALS REQUIRED FOR CONSTRUCTION OF APPROACH SLAB AND SURFACING WORK FOR 5 NOS PERMANENT BRIDGES AT KM 191.75 KM 190.88 KM 190.55 KM 188.72 AND KM 146.70 ON BJ RD OF NH 53 UDR 115 RCC 765 TF UDR P PSK IN MANIPUR |
15/04/2013 |
See... |
| SS OF VARIOUS MATERIALS REQUIRED FOR SRMD WORKS BETWEEN KM 186.499 TO KM 207.100 ON BJ RD OF NH37 IN THE SECTOR OF 115 RCC UDR 765 TF UDR PROJECT PSK IN MANIPUR STATE KM ZERO RECKONED FROM IMPHAL |
15/03/2013 |
See... |
| SS OF VARIOUS MATERIALS REQUIRED FOR APPROACHES OF BRIDGES AT KM 211.760 AND 215.730 ON BJ RD IN THE SECTOR OF 115 RCC UNDER 765 BRTF UNDER PROJECT PUSHPAK IN MANIPUR STATE KM ZERO RECKONED FROM IMPHAL |
14/02/2013 |
See... |
| DETAILS OF TENDERING ACTION AND CONTRACT CONCLUDED JAN 2013: PROJECT PUSHPAK |
06/02/2013 |
See... |
| RISK AND COST TENDER FOR SUPPLY AND STACKING OF GSB MATERIALS REQUIRED FOR SURFACING WORKS FOR EXECUTION OF SARDP WORKS BETN KM 20.00 TO KM 26.00 ON RD SL NH 54 UNDER 765 TF PROJECT PSK IN ASSAM STATE |
04/02/2013 |
See... |
| SS OF 45 MM STONE METAL AT WMM PLANT SITE AT KM 20.500 ON RD SJ REQUIRED FOR EXECUTION OF BALANCE WMM WKS FOR SARDP WRK ON ROAD SJ UDR 765 TF UDR P PSK IN ASSAM STATE SECOND CALL |
04/02/2013 |
See... |
| SS of stone chips 13.20 mm and stone chips 11.20 mm for resurfacing works between km 3.000 to 10.000 on Tuipang Laki Lope Longpuk road under 71 RCC 24BRTF Project Pushpak in Mizoram State Retender 3rd Call |
31/01/2013 |
See... |
| Supply of Batteries of various sizes to be delivered at 1034 I ESPL located at Silchar Assam under 765 BRTF under Project Pushpak in Assam State |
24/01/2013 |
See... |
| SS OF VARIOUS TYPES OF ROAD SIGN BORDS AT KM 7.000 ON S J RD DETT KASHIPUR UDR PART I AND AT KM 16.00 ON S L RD DETT NUTAN BAZAAR UNDER PART II KM ZERO RECKONED FROM SILCHAR UDR 765 TF P PSK IN ASSAM |
07/01/2013 |
See... |
| SS OF 45 MM STONE METAL AT WMM PLANT SITE AT KM 20.500 ON ROAD SJREQUIRED FOR EXECUTION OF BALANCE WMM WORKS FOR SARDP WORK ON ROAD SJ UDR 765 TF UDR P PSK IN ASSAM STATE |
05/01/2013 |
See... |
| PL OF BITUMINOUS MACADAM LAY 50 MM THICK COMPACTED AND SDBC LAYER 25 MM THICK COMPACTED ROLLED COMPLETE INCLUDING APPLICATION OF TACK COAT TO THE REQUIRED SPECIFICATIONS FOR SARDP WRK BETW 19.600 TO 20.850 ON S J RD UDR 765 TF PSK |
04/01/2013 |
See... |
| PL OF HOT APPLIED THERMOPLASTIC COMPOUND 2.5 MM THICK AS PER MOSRTH SPECIFICATION NO 803 VARIOUS ROAD SECTOR OF 115 RCC AND 83 RCC UNDER 765 BRTF PROJECT PUSHPAK IN ASSAM AND MANIPUR STATE |
03/01/2013 |
See... |
| SS of stone chips 13.20 mm and 11.20 mm for premix carpet for resurfacing works 2012 13 between Km 70.60 and Km 135.55 from Hnathial end on Road Hnathial Sangau Saiha under 71 RCC 24 TFProject Pushpak in Mizoram state Retender 2nd Call |
26/12/2012 |
See... |
| SHORT TERM TENDERING FOR SS OF STONE METAL 40 MM STONE CHIPS 13.20 MM AND COARSE SAND FOR WBM SURFACING WRK BETW 0.00 TO 11.420 ON FARKAWN THEKTE RD UDR 24 TF PROJECT PSK IN MIZORAM |
14/12/2012 |
See... |
| SS of stone chips 13.20 mm and stone chips 11.20 mm for re-surf works between km 0.000 to 10.000 on Tuipang Laki Lope Longpuk road under 71 RCC 24BRTF Project Pushpak in Mizoram State Retender 2nd Call |
14/12/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 05 of 2012 13 |
08/12/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 06 of 2012 13 |
08/12/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 07 of 2012 13 |
08/12/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 08 of 2012 13 |
08/12/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 09 of 2012 13 |
08/12/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 10 of 2012 13 |
08/12/2012 |
See... |
| SS OF COARSE SAND FOR CONSTRUCTION OF SUBSTRUCTURE OF 50 MTR SPAN MAJOR PERMANENT BRIDGE SEKULUI AT KM 94.465 ON LDP ROAD UNDER 71 RCC 24 TF P PSK IN MIZORAM STATE RETENDER 3RD CALL |
30/11/2012 |
See... |
| SS OF COARSE SAND FOR PERMANENT WORKS BETWEEN KM 10.000 TO 20.000 ON ZMS ROAD 71 RCC 24 BRTF PROJECT PUSHPAK IN MIZORAM STATE RE TENDER 2ND CALL |
30/11/2012 |
See... |
| P AND L OF BM 50 MM AND SDBC 25 MM FOR RESURFACING 2012 13 BETWEEN 2.650 TO KM 8.540 EXCEPT FROM KM 3.600 TO KM 4.250 ON SILCHAR JIRIBAM ROAD UNDER 765 TF P PUSHPAK IN ASSAM STATE KM ZERO RECKONED FROM SILCHAR |
15/11/2012 |
See... |
| SUPPLY AND STACKING OF STONE METAL 40 MM, STONE CHIPS 20 MM AND COARSE SAND FOR CONSTRUCTION OF SECURITY WALL OF HQ CE PROJECT PUSHPAK IN MIZORAM STATE |
14/11/2012 |
See... |
| SS OF STONE CHIPS 13.20 MM AND 11.20 MM FOR PREMIX CARPET FOR RESURFACING WORKS 201213 BETWEEN KM 70.60 AND KM 135.55 FROM HNATHIAL END ON ROAD HNATHIAL SANGAU SAIHA UNDER 71 RCC/24BRTF/PROJECT PUSHPAK IN MIZORAM STATE |
02/11/2012 |
See... |
| PROVIDING AND LAYING OF BC 40 MM AND BUSG 75 MM WITH COMPACTION AND APPLYING TACK COAT FOR RESUR BETN KM 31.000 TO KM 44.250, KM 65.245 TO KM 70.190 UDR PART I, AND BETN KM 83.000 TO KM 96.225 UDR PART II ALL WKS ON I- J RD FOR RESUR WKS UDR 765 TF |
26/10/2012 |
See... |
| HC OF STORES I CEMENT FROM CEMENT FACTORY AT BADARPUR ASSAM AND FROM 510 SSTC NAGATILA SILCHAR II BITUMEN STEEL FROM 510 SSTC NAGATILA SILCHAR AND III RATION FROM MASHIMPUR TO VARIOUS LOCATIONS OF 71 RCC AND 74 RCC UDR 24 TF UDR PART I AND PART II |
23/10/2012 |
See... |
| SS OF VARIOUS MATERIALS REQUIRED FOR GSBC AND WBM WORK BETWEEN KM 2.500 TO KM 5.000 ON ROAD SILCHAR LAILAPUR NH54 IN THE SECTOR OF 115 RCC UDR 765 TF UDR P PSK IN ASSAM STATE KM ZERO RECKONED FROM SILCHAR |
22/10/2012 |
See... |
| S AND S OF COARSE SAND AS PER IS: 383 OF 1970 TABLE 4 GRADING ZONE II FOR CONSTRUCTION OF SUBSTRUCTURE OF 50 MTR SPAN MAJOR PERMANENT BRIDGE SEKULUI AT KM 94.465 ON LAWNGTLAI DILTLANG PARVA RD UDR 71 RCC 24 TF P PSK RE TENDER 2ND CALL |
22/10/2012 |
See... |
| SS OF STONE CHIPS 13.20 MM PASSING 22.4 MM IS SIEVE AND RETAINED ON 11.2 MM IS SIEVE AND STONE CHIPS 11.20 MM PASSING 13.20 MM IS SIEVE AND RETAINED ON 5.60 MM IS SIEVE FOR RE SURF WKS BETW KM 0.000 TO 10.000 ON TLLL RD UDR 71 RCC 24 TF P PSK |
22/10/2012 |
See... |
| HC OF BITUM BIT EMULSION CRMB AND STEEL FROM IOC NOONMATI GHY AND SAIL GHY AND CEMENT FROM DIFFERENT CEMENT FACTORIES IN MGL ASSAM TO 1034 IESPL SILR UDR PART I FOR 765 TF AND 510 SSTC AT NAGTILLA SILCHAR UDR PART II FOR 24 TF ONLY IN ASSAM |
13/10/2012 |
See... |
| SS OF COARSE SAND CRUSHR SAND PASSING 2.36 MM I.S. SIEVE AND RETAINS ON 180 MICRON I.S. SIEVE FOR RESURF WSK BTWN KM 4.00 TO 15.00, 50.00 TO 74.331, 117.00 TO 125.75 AND 132.09 TO 135.55 FROM HNATHIAL ON RD HNATHIAL SANGAU SAIHA UDR 71 RCC 24TF |
12/10/2012 |
See... |
| SUPPLY AND STACKING OF COARSE SAND AS PER IS: 383 OF 1970, TABLE 4 AND GRADING ZONE II FOR PERMANENT WORKS BETWEEN KM 10.000 TO 20.000 ON ZAWNGLING MAWHERE SAPI ROAD 71 RCC 24 TF P PSK IN MIZORAM |
12/10/2012 |
See... |
| SUPPLY OF BATTERIES AT KM 43.00 ON ROAD AIZAWL LUNGLEI AT DETT 510 SSTC 24 BRTF PROJECT PUSHPAK IN MIZORAM STATE |
12/10/2012 |
See... |
| SUPPLY AND STACKING OF STONE METAL, STONE CHIPS SCREENING AND SAND FOR WBM SURFACING WORK BETWEEN KM 0.00 TO KM 10.000 ON KHUANGPHAH NEW VAIKHATLANG KAWLBEM RD UNDER 24 TF P PUSHPAK IN MIZORAM STATE |
08/10/2012 |
See... |
| S AND S OF STONE METAL 63 TO 45 MM STONE CHIPS 13.20 TO 11.20 MM AND COARSE SAND FOR WBM AND BT 25 MM FOR SURFACING WORK BETWEEN KM 0.00 TO 11.420 ON FARKAWN THEKTE RD UNDER 24 TF P PUSHPAK IN MIZORAM STATE |
06/10/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 01 of 2012 13 |
29/09/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 02 of 2012 13 |
29/09/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 03 of 2012 13 |
29/09/2012 |
See... |
| Acceptance of CA No. CE Project Pushpak 04 of 2012 13 |
29/09/2012 |
See... |
| SS OF READY MIX FOR BC 40 MM AND MATERIALS FOR BUSG 75 MM BETWEEN 31.000 TO 44.250 AND 65.245 TO 70.190 AND 83.000 TO 96.225 ALL WORKS ON I J RD 765 BRTF P PSK KM ZERO RECKONED FROM IMPHAL 2nd CALL |
29/09/2012 |
See... |
| SS OF VARIOUS MATERIALS REQUIRED FOR BUSG AND 20 MM THICK PREMIX CARPET WITH SSC FOR RESURF WORK BETWEEN KM 106.590 TO KM 112.500 AND KM 132.000 TO KM 150.300 ON S C RD UNDER 24 TF PROJECT PUSHPAK IN MIZORAM STATE 3RD CALL |
29/09/2012 |
See... |
| S AND S OF VARIOUS MATERIALS REQD FOR IRMD WKS 2012 13 BETWN KM 26.240 TO KM 26.450 ON RD S B UNDER 765 TF UNDER P PSK IN ASSAM STATE KM ZERO RECKONED FROM SIL SECOND CALL |
27/09/2012 |
See... |
| S AND S OF VARS MATERIALS REQD FOR BUSG AND PREMIX CARPET WITH SAND SEAL COAT BTWN KM 133.230 TO KM 138.000 AND KM 139.285 TO KM 149.675 FOR RE SURF AND CORRECTION WK ON K D A RD UNDER 765 TF UNDER P PSK IN MIZM S KM ZERO RECKONED FROM SILCR |
25/09/2012 |
See... |
| SUPPLY OF TYRES, TUBES AND FLAP RUTS OF VARIOUS SIZES AT 1034 I ESPL UNDER PARTI FOR 765 BRTF AND AT 510 SSTC AT NAGATILLA/SILCHAR ASSAM UNDER PARTII FOR 24 BRTF UNDER PROJECT PUSHPAK |
25/09/2012 |
See... |
| S AND S OF WMM MATERIALS OF VARIOUS GRADING AT WMM PLANT SITE AT KM 20.50 ON SJ RD REQD FOR EXECUTION OF BALANCE WMM WKS FOR SARDP WKS ON RD SB, SJ AND SL UNDER 765 TF UNDER P PSK IN ASSAM STATE 3rd CALL |
11/09/2012 |
See... |
| S and s of coarse sand As per IS 383 of 1970 Table 4 Grading Zone II for Pmt works betwn Km 15.000 to 25.000 on K New V K road Under 74 RCC 24 BRTF P PSK in Mzm State |
10/09/2012 |
See... |
| Details of contraact concluded Aug 2012 Project Pushpak |
04/09/2012 |
See... |
| S AND S OF WMM MATERIALS OF VARIOUS GRADING AT WMM PLANT SITE AT KM 20.50 ON S- J RD REQD FOR EXECUTION OF BALANCE WMM WKS FOR SARDP WKS ON RD SILCHAR-BADARPUR NH-53 SILCHAR-JIRIBAM NH-53 AND SILCHAR-LAILAPUR |
16/08/2012 |
See... |
| Widening and raising of existing road to 2lane NH standards between Km 2.65 to Km 8.540 except between Km 3.60 and Km 4.25 on road SilcharJiribam |
16/08/2012 |
See... |
| S and s of coarse sand As per IS 383 of 1970 Table 4 Grading Zone II for Pmt wrks btwn Km 0.000 to 15.000 on K New V K road Under 74 RCC 24 BRTF P PSK in Mzrm State |
14/08/2012 |
See... |
| S and s of coarse sand As per IS 383 of 1970 Tbl 4 and Gdng Zone II for constr of substr of 50 M span m pmt bridge Sekului at Km 94.465 on L D P road udr 71 RCC 24 TF P PSK in Mzm St |
14/08/2012 |
See... |
| S and S of Stone Boulder for WBM Works Aggregate Impact Value maximum 30 and Water Absorption maximum 2 btwn Km 6.000 to 10.000 on Z M S road Under 71 RCC 24 TF P PSK in Mizo St |
14/08/2012 |
See... |
| S AND S OF VARIOUS MATERIALS REQD FOR IRMD WORKS 2012 13 BET KM 26.240 TO KM 26.450 ON RD SILCHAR BADARPUR UNDER 765 TF UNDER PROJECT PSAK IN ASSAM STATE |
13/08/2012 |
See... |
| SUPPLY AND STACKING OF VARIOUS MATERIALS REQUIRED FOR BUSG AND 20 MM THICK PREMIX CARPET WITH SSC FOR RESURFACING WORK BETWEEN KM 106.590 TO KM 112.500 AND KM 132.000 TO KM 150.300 ON SEILING-CHAMPHAI ROAD |
04/08/2012 |
See... |
| S S of s chips 20 mm s metal 40 mm and coarse sand for constr of PMT boundary wall for 24 TF at km 43.00 on A L rd under 74 RCC 24 TF P PSK in Mizoram State Re tender |
23/07/2012 |
See... |
| CARRYING OUT SUB SOIL INVESTIGATION AND SUBMISSION OF DETAILED SUB SOIL INVESTIGATION REPORT FOR CONSTR OF MAJ PMT BRDG OVER RIVER TUICHANGLUI AT KM 126.300 ON RD L-D-P UNDER PART-I AND OVER RIVER GAUSAN AT KM 130.900 ON RD |
20/07/2012 |
See... |
| S AND S OF COARSE SAND CRUSHER SAND PASING 2.36 MM IS SIEVE AND RETAINS ON 180 MICRON IS SIEVE FOR RESURF WKS BET KM 17.069 TO 30.000 AND KM 76.000 TO 88.000 ON LDP RD |
17/07/2012 |
See... |
| S AND S OF COARSE SAND CRUSHER SAND PASSING 2.36 MM IS SIEVE AND RETAINS ON 180 MICRON IS SIEVE FOR RESURF WKS BET KM 0.000 TO KM 10.000 ON T-L-L-L RD |
13/07/2012 |
See... |
| SUPPLY AND STACKING OF COARSE SAND AS PER IS: 383 OF 1970, TABLE4 GRADING ZONEII FOR PERMANENT WORKS BETWEEN KM 40.000 TO KM 47.000 ON TUIPANGLAKILOPELUNGPUK ROAD |
13/07/2012 |
See... |
| SUPPLY AND STACKING OF COARSE SAND AS PER IS: 383 OF 1970, TABLE4 GRADING ZONEII FOR PMT WORKS BET KM 0.000 TO 11.420 ON FARKAWN THEKTE ROAD |
13/07/2012 |
See... |
| S AND S OF COARSE SAND CRUSHER SAND PASING 2.36 MM IS SIEVE AND RETAINS ON 180 MICRON IS SIEVE FOR RESURF WKS BET KM 17.069 TO 30.000 AND KM 76.000 TO 88.000 ON LDP RD |
13/07/2012 |
See... |
| HIRING OF VEH/EQPT/PLANT FOR CONSTRUCTION / IMPROVEMENT OF ROAD ZAWNGLINGMAWHRESAPI SECTOR: KM 10.000 TO KM 15.000 IN MIZORAM |
09/07/2012 |
See... |
| HIRING OF VEH/EQPT/PLANT FOR CONSTRUCTION/IMPROVEMENT OF ROAD KHUANGPHAH-NEW VAIKHWTLANG-KAWLBEM SECTOR KM 15.00 TO KM 20.00 IN MIZORAM |
09/07/2012 |
See... |
| S S OF READY MIX FOR BM BC FOR RESURF 201213 BET 2.170 TO 8.000 ON SILCHARLAILAPUR RD UNDER PARTI AND S S OF READY MIX FOR BM BC FOR RESURF 201213 BET 0.130 TO 2.540 ON SJ RD |
16/06/2012 |
See... |
| S AND S OF VARIOUS MATERIALS REQD FOR BUSG BET KM 31.000 TO KM 44.250 ON IJ RD AND VARIOUS MATERIALS REQD FOR SDBC AT KM 25 HMP LOCATION ON IJ RD |
15/06/2012 |
See... |
| S AND S OF STONE CHIPS 20 MM AS PER MORTH CLAUSE 1007 TABLE 10001 STONE METAL 40 MM AS PER MORTH CLAUSE 1007 TABLE 10001 AND COARSE SAND AS PER MORTH CLAUSE 1008 TABLE 10002 FOR CONSTRU OF PMT BOUNDARY WALL FOR HQ 24 TF AT KM 43.00 ON AL RD |
02/06/2012 |
See... |
| SUPPLY AND STACKING OF VARIOUS MATERIALS REQUIRED FOR CONSTRUCTION OF 01 NO MAJOR PERMANENT BRIDGE AT KM 150.700 AND 04 NOS MINOR PERMANENT BRIDGES AT KM 147.700, 152.500, 155.500 AND 155.700 ON ROAD BARAKJIRIBAM |
30/05/2012 |
See... |
| DETAILS OF TENDERING ACTION AND CONTRACT CONCLUDED MAR 2012 PROJECT PUSHPAK |
04/04/2012 |
See... |
| DETAILS OF TENDERING ACTION AND CONTRACT CONCLUDED MAR 2012 PROJECT PUSHPAK |
04/04/2012 |
See... |
| DETAILS OF TENDERING ACTION AND CONTRACT CONCLUDED MAR 2012 : PROJECT PUSHPAK |
04/04/2012 |
See... |
| SUPPLY AND STACKING OF VARIOUS MATERIALS REQUIRED FOR CONSTRUCTION OF 05 NOS MINOR PERMANENT BRIDGES AT KM 147.700, 150.700, 152.500, 155.500 AND 155.700 ON ROAD BARAKJIRIBAM |
03/04/2012 |
See... |