CAs : HQ CE (P) DEEPAK

CA CE (P) DPK/             /2005-2006  
S/No. Description of work A/U Approximate Qty Unit Rate in Rs. Total Amount in Rs. Period of Completion
1 2 3 4 5 7 9
1 SUPPLY AND STACKING OF STONE METAL 53-20MM SIZE, CHIPS 13.2MM SIZE, STONE CHIPS 11.2MM SIZE AND SAND FOR  CARRYING OUT 2.5CM THICK RESURFACING WORK WITH 7.5CM THICK BUSG FOR CORRECTION WORK BETWEEN KM 205.00 TO 222.39 ON MANALI-SARCHU ROAD UNDER 70  RCC SECTOR IN HP STATE  03  Months from the date of placing Work Order
(a) Crushed Stone metal  53-20mm  Cum 652.54 1000.00 652540.00
(b) Crushed Stone Chips 13.2mm  Cum 2210.26 1625.00 3591672.50
(c) Crushed Stone Chips 11.2mm  Cum 1062.72 1625.00 1726920.00
(d)  Crushed Stone dust /coarse sand  Cum 559.32 700.00 391524.00
        G/Total Rs. 6362656.50  
Say Rs. 63,62,656.00
(Rupees sixty three lacs, sixty two thousands, six hundred and fifty six only). 
Sd-x-x-x
Signature of Contractor (KP Singh)
Brig
Dated :            Apr  2005 Chief Engineer
(for and on behalf of president of India)
Accepting Officer
CA CE (P) DPK/             /2005-2006  
 
S/No. Description of work A/U Approximate Qty Unit Rate in Rs. Total Amount in Rs. Period of Completion
1 2 3 4 5 7 9
1 SUPPLY AND STACKING OF STONE METAL 53-20MM SIZE, CHIPS 13.2MM SIZE, STONE CHIPS 11.2MM SIZE AND SAND FOR  CARRYING OUT 2.5CM THICK RESURFACING WORK WITH 7.5CM THICK BUSG FOR CORRECTION WORK BETWEEN KM 56.00 TO 91.00 ON MANALI-SARCHU ROAD UNDER 67 RCC SECTOR IN HP STATE  03  Months from the date of placing Work Order
(a) Crushed Stone metal  53-20mm  Cum 384.52 800.00 307616.00
(b) Crushed Stone Chips 13.2mm  Cum 1307.91 1250.00 1634887.50
(c) Crushed Stone Chips 11.2mm  Cum 626.21 1250.00 782762.50
(d)  Crushed Stone dust /coarse sand  Cum 329.59 600.00 197754.00
        G/Total Rs. 2923020.00  
(Rupees twenty nine lacs, twenty three thousands and twenty only).
Sd-x-x-x
Signature of Contractor (KP Singh)
Brig
Dated :            Apr  2005 Chief Engineer
(for and on behalf of president of India)
Accepting Officer